Most people who call us start with the same question: what will my steel building cost? It’s a fair question, and price is often the reason buyers find SteelBuilt in the first place. But the number on a building materials quote is only part of the story. The full steel building cost in Canada includes drawings, permits, consulting, construction, and trades, and those pieces are where budgets usually go sideways.
Here’s how SteelBuilt owner John Montgomery explains it.

Priceville, ON | 30x40x14, Steel Garage
Why the cheapest steel building quote can cost you more
There’s a race to the bottom in this industry. Some suppliers cut corners to get the lowest price on the building itself, then the real costs show up later in the project.
“We know the things that people do to race to the bottom to the cheapest price in the building that’ll cost you money on the other side. So if you take the whole project, we save you money at every part.”
John on why we look at the whole project, not just the building price.
That’s the difference. A low price on steel is useful. A low price on the whole project is what actually protects your budget.
Soft costs: the part of the budget most buyers miss
Before a single piece of steel arrives, a project needs work that doesn’t show up on a materials quote. These are the soft costs, and according to John they usually add up to 30 to 40% of the price of your building.
Permits and municipal approval
Working out what your town requires and getting the application through.
Drawings and engineering
Building and foundation drawings designed for your site and your provincial codes.
Consulting and planning
Advice on size, layout, insulation, and site before you commit.
Project coordination
Lining up the foundation, erection, and trades so they happen in the right order.
How the general contractor model adds up
Here’s a typical way it goes when you hire a general contractor first. John walks through it:
“You hire a GC, and they say, before you hire me, we estimate your building’s going to be $4 million. We want $50,000 deposit, and then we’ll teach you all these things that you may or may not know.”
In that model you pay up front just to learn what your project involves. At SteelBuilt we do that work as part of getting you to a quote.
“Just so you know, our price for all of that will be zero. And the price for all the design before you order your building will be zero.”
Your steel building cost, line by line
The other way we save you money is by keeping every part of the project visible. John explains:
John on why every part of your build gets its own quote.
Design and engineering
We start with the building itself: size, loads, and layout for your site.
Building materials, quoted on their own
Your steel building package has its own price, so you can see exactly what the structure costs.
Construction, quoted separately
We own our construction company, SteelBuilt Construction Canada, so we can quote foundation and erection work on its own page instead of folding it into one number.
Trades, with real options
Take electrical. We'll give you four or five options and our own electrical quote. You can have us install it, or pick a different product.
“You’re involved in every part of the spend. We just have the whole network under one roof.”
With a general contractor, you’re often told what to do and handed the bills. With SteelBuilt, you make the purchasing decisions on every part, and you still have one team coordinating the whole build.

Mississauga, ON | 40x128x28, Industrial Building
What this means for your budget
- Budget for the whole project, not just the building. Soft costs can be a third of the total or more.
- Ask what’s included before you pay a deposit. Design and consulting should not be a cost of finding out what your project involves.
- Get each part quoted separately. It’s the easiest way to see where your money goes and where you have choices.
- Keep control of the spend. You should be able to pick the products and trades that fit your budget.
Every building is different. Snow loads in British Columbia are not snow loads in Ontario, and a site in the Prairies has different needs than one in Quebec. That’s why we don’t publish a single price. If you want typical ranges per square foot before you call, our guide to steel building prices in Canada covers them. Then tell us about your project and we’ll quote it line by line.
Common questions
How much does a steel building cost in Canada?
It depends on size, snow and wind loads for your province, insulation, foundation, location, and whether you install it yourself or hire a crew. That's why we quote each project individually instead of publishing one price. Request a free quote and we'll price each part of your build separately.
What are soft costs on a steel building project?
Soft costs are everything that isn't the building or the construction itself: drawings, engineering, permits and municipal approval, consulting, and planning. They can add up to 30 to 40% of the price of a building, so they belong in your budget from day one.
Does SteelBuilt charge for design before I order my building?
No. Consulting, drawings, and design work before you order your building are provided at no charge.
Can I choose my own products and trades?
Yes. We quote construction and trades like electrical separately from your building materials, with options. You can have SteelBuilt handle the work or choose a different product or provider.
Do I need a general contractor to build a steel building?
Not with SteelBuilt. Our construction company, SteelBuilt Construction Canada, can quote the foundation and erection work for you, or you can install the building yourself with detailed instructions and technical support.